Cabinets & Trim

2009 July 22
by admin

OK -  I know it has been awhile.I wouldn’t say things are slowing down as the pace is still pretty aggressive, the changes just aren’t as dramatic on a daily basis.

 

Remodel 316Remodel 315

Cabinets waiting to be installed and Master shower ready to be floated.

 

Remodel 352

Remodel 353

Remodel 354

Remodel 350

Kitchen cabinets installed, a look at the apron front sink and the pantry.

 

Remodel 355  Remodel 356

Back corner of the kitchen and the doors out to back yard.

 

Remodel 348

Remodel 347

Layla’s sink and the new door and trim to her closet.

 

Remodel 362

Remodel 361

Doors out master bedroom to deck and the master shower.

 

Remodel 320Remodel 321 

Remodel 322A look at the front of the house w/ the shingle stain and trim painted. We should have the color coat of stucco next week.

2 Responses leave one →
  1. 2009 July 24
    Aunt Donna permalink

    So great!!!!

  2. 2009 August 31
    Callie Ames permalink

    WOW, Layla’s sink looks great!!!! So glad to be part of this amazing remodel process!!! Keep up the great work! :)

Leave a Reply

Note: You can use basic XHTML in your comments. Your email address will never be published.

Subscribe to this comment feed via RSS